Thames Anglers' Conservancy Members Forum
TAC Members-Only Forum
If you have arrived here and not yet signed up as a member, then please first join at http://forum.rivertac.org/register using your real name.

Forum Membership is with Real Names only.
Please create a Username that is your First Name and Surname eg. "Joe Bloggs"
(This will save our Admin team the need to contact you about changing it)

http://rivertac.org/membership


Thames Anglers' Conservancy Members Forum
 
HomeHome  TAC Home PageTAC Home Page  SearchSearch  FAQFAQ  RegisterRegister  Log in  
Navigation
Search
 
 

Display results as :
 
Rechercher Advanced Search
Latest topics
» Eel Trap Results 2017
Sat Jul 22, 2017 4:36 pm by patrick barker

» Better access to free Thames fishing in Reading
Fri Jun 16, 2017 10:08 am by Ed Randall

» Eel screens on Water Works intakes
Tue May 23, 2017 10:26 pm by Julian Jones

» River Thames Conditions - Quick Dial Numbers
Sun May 21, 2017 10:00 am by Ed Randall

» Ap[ril showers? If only! Drought beckons...
Thu May 04, 2017 6:56 pm by Ed Randall

» Abbey river this Saturday (12/5/2012)
Thu Apr 27, 2017 4:41 pm by Ed Randall

» Molesey Eel Monitoring Training ~ 29th April 2017
Mon Apr 24, 2017 11:12 am by David Harvey

» Thames Water fined a record £20m for River Thames pollution
Fri Mar 24, 2017 1:54 pm by Stephen Bond

» Crane Riverfly Training ~ May 6th 2017
Thu Mar 16, 2017 9:08 am by Ed Randall

» TAC visit to Tideway Tunnel Exhibition in Parliament
Wed Mar 15, 2017 7:32 am by John LeSurf

» "Citizen Crane" project - sampling dates
Thu Mar 02, 2017 4:24 pm by Ed Randall

» Egham & Stains bankside enhancement followed by brewery trip
Sun Feb 19, 2017 6:27 pm by Ed Randall

» SE Rivers Trust needs help on Hogsmill
Tue Feb 14, 2017 2:23 pm by Ed Randall

» Crane volunteering opportunities
Fri Jan 27, 2017 5:38 pm by Ed Randall

» Seal (with enormous fish) in Thames near Richmond Lock
Wed Jan 25, 2017 8:34 am by Ed Randall

» [Petition] to eradicate size and catch limits for pike to be taken and culled
Wed Jan 25, 2017 8:27 am by Ed Randall

» *Thames Tunnel (Tideway Tunnel)*
Tue Jan 24, 2017 9:42 pm by Ed Randall

» reels for sale
Thu Jan 12, 2017 9:51 am by JeffHowe

» A new address for 2017 ~ forum.rivertac.org
Sun Jan 01, 2017 11:06 am by Admin

» New users - Registration issues
Thu Dec 29, 2016 11:47 am by Ed Randall

» Shepperton river death - Van removed near Dockett Eddy Lane
Thu Dec 22, 2016 9:54 am by Ed Randall

» EA Pollution incidents: 2015 evidence summary
Mon Nov 21, 2016 5:04 am by David Harvey

» Ham & Petersham cleanup Saturday 19th Nov
Sat Nov 12, 2016 6:01 pm by Ed Randall

» LIVE THAMES TEMPS AND CLARITY - TAC exclusive!
Thu Nov 10, 2016 9:51 pm by Stephen Bond

» Citizen Crane Forum at ZSL - Mon 14th Nov 2016
Thu Nov 10, 2016 8:36 am by Ed Randall

» fishing trolleys
Sun Oct 30, 2016 11:23 am by Harry Notley

» Draw off 2016
Sat Oct 29, 2016 2:24 pm by Ed Randall

» Exciting new Smelt Project - call for volunteers!
Sat Oct 22, 2016 2:22 pm by Ed Randall

» Garlic spam
Tue Oct 11, 2016 10:51 pm by David Harvey

» Eel Trap Results 2016
Tue Oct 11, 2016 10:31 pm by David Harvey

Angling Data View
River Levels
UK Map

Thames Tides

Share | 
 

 Repair work completed on vital flood defence scheme

View previous topic View next topic Go down 
AuthorMessage
Admin
Admin
Admin
avatar

Posts : 488
Join date : 2009-12-27

PostSubject: Repair work completed on vital flood defence scheme   Tue Nov 16, 2010 8:57 pm

The Environment Agency has completed vital repair work to a flood defence scheme which reduces the risk of flooding to thousands of properties in Surrey.

A routine inspection on the Lower Mole Flood Alleviation Scheme last year revealed erosion to a 30-metre stretch between Island Barn Sluice and the River Thames, near Molesey. Design works were carried out from January to May 2010, with work starting on site in September. Construction was completed last month, although some environmental enhancements will be carried out over the next few weeks.

The scheme, which was built in the 1980s following widespread flooding to areas of Surrey and south London in September 1968, protects around 10,000 properties in the Molesey, Esher and Hersham areas.

The original scheme involved the creation of an engineered flood relief channel which followed the route of the River Ember. The channel is controlled by three large motorised weirs. Raised embankments and flood walls were constructed to protect residential and commercial properties.

Ian Mawdsley, the Environment Agency’s Project Manager, said: “I am extremely pleased that this work has been completed, maintaining the required standard of protection to the local community.

“Doing nothing here was not an option as left in its current state the damaged area would have grown in size - compromising the Environment Agency’s ability to operate and maintain the defences.”

A temporary dam was installed to allow the repair work to be carried out. This ensured that the water level in the main channel was maintained, preventing damage to fish stocks and river habitats.

In addition to the bank repair works, a new 2km access track has been constructed along the top of the flood defences. This ensures that the Environment Agency will be able to operate and maintain the scheme at all times.

Environmental enhancements to be made include planting riverside plant species, improving fishing platforms and installing bat boxes.
Back to top Go down
http://www.rivertac.org
 
Repair work completed on vital flood defence scheme
View previous topic View next topic Back to top 
Page 1 of 1
 Similar topics
-
» installing additional instruments (temperature and fuel gauge) - work completed
» CO2 Cartridges do they work?
» Diesel fuel pump repair
» fiberglass fairing repair?
» Nealey Tire Repair Kit

Permissions in this forum:You cannot reply to topics in this forum
Thames Anglers' Conservancy Members Forum :: Open Section :: News Board :: Environment Agency-
Jump to: